Factory Modular
For Government Agencies, School Districts, and Non-Profit Developers

On Budget.
On Schedule.
Documented.

Predictable pricing and delivery in 8 months. IBC compliant, with HUD code inspection underway. Every module inspected and documented before it leaves the factory. Factory-built construction that meets your schedule, your budget, and your environmental commitments.

Compliance Documentation Package

Every Factory Modular project ships with a full compliance record. Available for permit submission, public record, and post-occupancy audit.

IBC Code Compliance Documentation
Conqa Factory Inspection Logs
Module QA and MEPF Documentation
Delivery and Installation Record
8 monthsGroundbreak to occupancy
Predictable priceWithin ~$1/sf of quote
IBC compliantHUD code inspection underway

Compliance and QA

Every module has
a paper trail.

Public projects require documentation that conventional construction rarely produces. Factory Modular delivers a complete build record: IBC compliance documentation, Conqa factory inspection logs, module-by-module QA records, and MEPF system documentation. All of it structured for permit submission, public record, and post-occupancy audit.

When a council member or oversight body asks how the project was built, you have an answer on file.

Request a compliance documentation sample

IBC compliant, HUD inspection underway

Every module is designed to International Building Code standards and inspected before shipment. HUD code inspection is underway, and our product has completed inspection for Hawaii. Documentation is structured for permit submission and public record from day one.

Conqa real-time QA documentation

Remote factory inspection via Conqa. Every weld, connection, and finish is recorded in real time. Project owners and inspectors have access to a complete, timestamped build record.

Predictable pricing, fewer surprises

Your board approved a budget. We price to it. Material and factory labor costs are known, so the factory price lands within about $1 per square foot of the quote. Only owner-directed changes and the final freight bid move it, which limits the cost escalation that creates political risk on conventional projects.

8-month delivery protects your timeline

Delays on public projects become headlines. An 8-month groundbreak-to-occupancy schedule, backed by factory production and documented milestones, gives you a defensible timeline before you commit.

Sustainability and Accountability

Your constituents are going to ask
about environmental impact.

Public agencies are increasingly required to document the environmental impact of capital projects. Factory-built modular produces 43% lower CO2 emissions during construction than equivalent site-built projects, based on peer-reviewed research, not marketing copy.

Conventional Construction
  • Material waste generated on every floor
  • On-site labor exposed to weather and schedule risk
  • No standardized environmental documentation
  • Embodied carbon difficult to measure or report publicly
Factory Modular
  • 43% lower CO2 emissions during construction (University of Florida, 2022)
  • Factory environment eliminates weather-driven carbon spikes
  • QA documentation available for every module
  • Citable peer-reviewed research available for public reporting and oversight

Source: Kouhirostami and Chini, Modular and Offsite Construction Summit, Edmonton 2022.

This is one week of installation. A documented, inspected, predictably priced project delivered to schedule.

Start Here

Let's build better.

Tell us your unit count, your site, and your timeline. We will tell you honestly whether modular works for your project and what the numbers look like. No pitch. No obligation. A straight answer.

Estimate Your Project

Typically responded to within 1 business day.