PNG – SMALL – Factory ModularPNG – SQUARE FM LOGO – Factory ModularPNG – SMALL – Factory ModularPNG – SMALL – Factory Modular
  • HOME
  • PRODUCT
  • CAPABILITIES
  • NEWS
  • CONTACT
✕

Modular News

Weekly modular updates from around the world.


Latest Posts

  • Welding on a modular house
    Volumetric Modular Beats Traditional on Environment
    September 20, 2023
    3
  • A Century of Modular Innovations: A Journey Through Architectural Evolution
    September 4, 2023
    25
  • Embracing the Advantages of Modular Building in 2023
    August 31, 2023
    20
  • Overcoming 6 Fears About Modular Construction
    August 30, 2023
    82
  • The Most Affordable Types of Houses to Build
    August 29, 2023
    87
Stay Informed: Subscribe to receive exclusive project updates and gain access to our price list

    PNG – SMALL – Factory Modular
    For modular projects, a preliminary evaluation is necessary. Please connect with us so we may provide you with the most accurate proposal.

    NAVIGATION

    • HOME
    • PRODUCT
    • CAPABILITIES
    • NEWS
    • CONTACT

    USEFUL LINKS

    McKinsey Modular Report

    Modular home Builders Mag

    NY Times on Modular 

    CA Factory-Built Laws

    Modular Building Institute

    SOCIAL MEDIA

    Twitter 

    Instagram

    youtube

    facebook

     

    © 2023 Factory Modular. All content on this website, including text, graphics, logos, images, and any other materials, is the property of Factory Modular LLC or its content suppliers and is protected by US copyright laws. Unauthorized use, reproduction, distribution, or modification of any content on this website is strictly prohibited. This includes but is not limited to copying, downloading, or sharing for commercial or non-commercial purposes without prior written consent from Factory Modular LLC.
    Privacy Policy
    ✕

     

    Some of the additional services offered by Factory Modular and our network of development experts:

    Add-On Services Offered

    LAND DEVELOPMENT & ENTITLEMENT
    • Planning, zoning, land use • Market studies / Comps. • Report management • Geo-tech, environmental, traffic, sound, etc. • Civil & Utility coordination • ALTA, Phase 1, Soils Review & Summary • Environmental clean-up management • Entitlement processing • Bond issuance • Underwriting & Proforma development • Project feasibility review • Equity stacks and waterfalls • Peak equity calculations • ROI, IRR, & NOI analysis • Sensitivity analysis • Risk analysis • Development budget preparation • Investor / Lender presentation package • Project cost validation • Construction loan management • Project reporting
    CONSTRUCTION MANAGEMENT
    • Project Scheduling - Primavera 6 - Microsoft Project • Cost estimating • Bid management • Budget preparation • GC & Subcontractor scope & budget review/analysis • Agency coordination • Contracting • Field Management • Staff procurement • Project Administration • Submittals procurement & review • RFI coordination • Change order processing • Draw & Payment management • Post construction closeout • Punch list & warranty coordination • Budget reconciliation • Bond Release • Agency coordination • Scheduling & Budgeting • Surety documentation • Warranty bond release finalization • Title & easement transfers • Habitat Turnover • Army Corps, USFW, CAFG, HOA’s, consultants and contractors management • Habitat Bond Release
    UTILITY SERVICES
    • Metering and Sub-Metering • Overhead OSHA Setbacks • Easement Vacation / Dedication • Encroachment Resolution • Engineering Design • Transmission and Distribution Applicant Design • Load Calc and Single Line Diagram • Title 24 Modeling • Utility Composite Plans and Conflict Detection • Application Preparation and Submittal • Application Preparation and Submittal • Discontinuance of Service (Rule 11) prior to demolition. • Temporary Power (Rule 13) to facilitate construction. • Extend Service (Rule 15) into building and Service-Related Equipment required to receive power. • New Service (Rule 16) to power a building. • Undergrounding Overhead Lines (Rule 20) • Construction Management – installation and meter sets.
    LEGAL
    • Letter of Intent • Notice to Proceed • Dispute Resolution • Project Forensics • Financial Audit and Damage Analysis • Lien Release • Bond Exoneration • Expert Witness • HOA Defect Claims • Complex Litigation